INVITATION TO APPLY FOR ELIGIBILITY AND TO BID
(Rebidding)

 

The Metals Industry Research and Development Center (MIRDC) and the Philippine Textile Research Institute (PTRI), through the General Funds for CY 2013 intends to apply the sum being the Approved Budget for the Contract (ABC) to payments under the contract for the hereunder projects. Bids received in excess of the ABC shall be automatically rejected at bid opening.

PROJECT

Agency

No. of
Personnel

ABC (PhP)

1. Security Services for CY 2013

MIRDC

8

2,500,000.00

2. Security Services for CY 2013

PTRI Bicutan

6

1,618,344.00

3. Security Services for CY 2013

PTRI Mis. Oriental

3

472,428.00

 

Location: MIRDC and PTRI, Gen. Santos Ave., Bicutan, Taguig City and PTRI Misamis Oriental
Delivery Period: CY 2013

 

Bidders should have completed, within THREE YEARS from the date of submission and receipt of bids (i.e. from November 2009), a contract similar to the Project. The description of an eligible bidder is contained in the Bidding Documents, particularly, in Section II, Instruction to Bidders. Duration of the contract to be bid shall be for three (3) years.

 

Bidding will be conducted through open competitive bidding procedures using a non- discretionary “pass/fail” criterion as specified in the Implementing Rules and Regulations (IRR) of Republic Act (RA) 9184, otherwise known as the “Government Procurement Reform Act.” Bidding is restricted to Filipino citizens/sole proprietorships, partnerships, or organizations with at least sixty percent (60%) interest or outstanding capital stock belonging to citizens of the Philippines, and to citizens or organizations of a country the laws or regulations of which grant similar rights or privileges to Filipino citizens, pursuant to RA 5183 and subject to Commonwealth Act 138.

 

Interested bidders may obtain further information from Ms. Nimfa O. Usero, MIRDC BAC Secretariat, and inspect the Bidding Documents at the address given below during office hours, 9:00 A.M. to 4:00 P.M.

 

A complete set of Bidding Documents may be purchased by interested Bidders on January 11, 2013 until the deadline for the submission of bids, from MIRDC and upon payment of a non-refundable fee for the Bidding Documents in the amount as indicated below:

PROJECT

Amount of Bidding Documents (PhP)

1. Security Services for CY 2013

4,500.00

 

The Metals Industry Research and Development Center (MIRDC) and the Philippine Textile Research Institute (PTRI) will hold a Pre-Bid Conference on January 21, 2013, 9:00 A.M. at the MIRDC Multi-Purpose Room, Basement, Laboratories Building, Gen. Santos Ave., Bicutan, Taguig City which shall be open only to all interested parties who have purchased the Bidding Documents.

 

Bids must be delivered to MIRDC BAC Secretariat on February 4, 2013 between 8:00 A.M. to 8:30 A.M. only. All Bids must be accompanied by a bid security in any of the acceptable forms and in the amount stated in ITB Clause 18.

 

Bid opening shall be on February 4, 2013, 9:00 A.M. at MIRDC Multi-Purpose Room, Basement, Laboratories Building, Gen. Santos Ave., Bicutan, Taguig City. Bids will be opened in the presence of the Bidder’s representatives who choose to attend at the address below. Late bids shall not be accepted.

 

The Metals Industry Research and Development Center (MIRDC) and the Philippine Textile Research Institute (PTRI) reserve the right to accept or reject any bid, to annul the bidding process, and to reject all bids at any time prior to contract award, without thereby incurring any liability to the affected bidder or bidders.

 

For further information, please refer to:

 

Signed
ATTY. TRIXIE HAZEL C. VELUZ
MIRDC BAC Chairperson
Tel. No.: (02) 837-0431 to 38 loc 444 and 442
Fax No. (02) 837-0430

Signed
MAY S. RICO, MA Eco
PTRI BAC Chairperson
Tel/Fax No.: (02) 837-1158

 

 

 

Approved for Posting:

 

Signed
AGUSTIN M. FUDOLIG, Dr. Eng.
Officer-In-Charge

 

 

 

INVITATION TO APPLY FOR ELIGIBILITY AND TO BID


“PROCUREMENT OF 5 UNITS THREE-PHASE INVERTER DUTY INDUCTION MOTORS AND 5 UNITS VARIABLE FREQUENCY DRIVE”

General Specifications

Five (5) units three-phase inverter duty induction motors

125 HP Three-phase inverter duty induction motor, with line drive encoder (ABZ Phase, 12V or 5V), 4 Pole, 440VAC, Totally enclosed (IP55), Blower cooled (fan runs independently from motor), foot-mounted with terminal boxes located at the side (terminal boxes for UVW terminal, encoder, and fan should be provided)

Five (5) units Variable Frequency Drive

150 HP Variable Frequency Drive, 650VDC input (accessible DC-Bus), 440 VAC three- phase output, compatible with line drive encoder feedback, with Torque mode function, discrete speed settings (multi-step speed), DC injection braking during start/stop function, RS 485 MODBUS Communication compatible, with provisions for dynamic braking (additional brake modules and resistors as prescribed by user manual), IP 20 Protection level

    1. The METALS INDUSTRY RESEARCH AND DEVELOPMENT CENTER through the project Development of a 60 passenger per Coach Capacity Automated Guideway Transit System intends to apply the sum of Four Million One Hundred Fifty Thousand Pesos (Php 4,150,000.00) being the Approved Budget for the Contract (ABC) to payments under the contract for “Procurement of 5 units three- phase inverter duty induction motors and 5 units Variable Frequency Drive”.
    2. The METALS INDUSTRY RESEARCH AND DEVELOPMENT CENTER (MIRDC) now invites bids for “Procurement of 5 units three-phase inverter duty induction motors and 5 units Variable Frequency Drive” located at Gen. Santos Ave., Bicutan, Taguig City. Delivery of Goods is Sixty (60) calendar days.
    3. Bidders should have completed, within three (3) years from the date of submission and receipt of bids, a contract similar to the Project. The description of an eligible bidder is contained in the Bidding Documents, particularly in Section II. Instruction to Bidders (ITB).
    4. Bidding will be conducted through open competitive bidding procedures using non- discretionary pass/fail criterion as specified in the Implementing Rules and Regulations (IRR) of Republic Act 9184 (RA 9184), otherwise known as the “Government Procurement Reform Act”
    5. Bidding is restricted to Filipino citizens/sole proprietorships, partnerships, or organizations with at least sixty percent (60%) interest or outstanding capital stock belonging to citizens of the Philippines.
    6. Interested bidders may obtain further information and inspect the Bidding Documents at the MIRDC BAC Secretariat, Ground Flr., Laboratories Bldg., on February 4, 2013 from 9:00 A.M. to 4:00 P.M.
    7. A complete set of Bidding Documents may be purchased by interested Bidders from the MIRDC BAC Secretariat, Ground Flr., Laboratories Bldg., upon payment of a nonrefundable fee for the Bidding Documents in the amount of Four Thousand One Hundred Fifty Pesos (Php 4,150.00)
    8. The MIRDC-BAC will hold Pre-Bid Conference on February 15, 2013 at 9:00 A.M. at the MIRDC Conference Room, 2nd Floor, MIRDC Laboratories Building, MIRDC Compound, Gen. Santos Ave., Bicutan, Taguig City which shall be limited only to all interested parties who have purchased the Bidding Documents.
    9. Bids must be delivered not later than February 28, 2013 between 8:00 to 8:30 A.M. at MIRDC Conference Room, 2nd Floor, MIRDC Laboratories Building, MIRDC Compound, Gen. Santos Ave., Bicutan, Taguig City. All bids must be accompanied by a bid security in any of the acceptable forms in the amount described in ITB.


      Bid opening shall be on February 28, 2013, 9:00 A.M. at the MIRDC Conference Room, 2nd Floor, MIRDC Laboratories Building, MIRDC Compound, Gen. Santos Ave., Bicutan, Taguig City. Bids will be opened in the presence of the bidders’ representatives who choose to attend.


    10. The Complete Schedule of Bidding Activities is summarized as follows:

Activities

Schedule / Time

Venue

1. Posting of Invitation to Bid

January 14, 2013

 

2. Issuance of Bid Documents

February 4, 2013
9:00 am to 4:00 pm

MIRDC-BAC Secretariat, Ground Floor, MIRDC Laboratories Bldg.

3. Pre-bid Conference

February 15, 2013
9:00 A.M

MIRDC, Conference Room, 2nd Floor, Laboratories Bldg.

4. Submission of Envelopes

February 28, 2013 between 8:00 A.M. to 8:30 A.M.

MIRDC, Conference Room, 2nd Floor, Laboratories Bldg.

5. Opening of Envelopes

February 28, 2013
9:00 A.M.

MIRDC, Conference Room, 2nd Floor, Laboratories Bldg.

  1. The Bidders shall submit three (3) copies of their duly accomplished eligibility requirements and Technical and Financial Proposal in two (2) separate sealed envelopes.
  2. The participating bidders/contractors should have completed a similar project of at least 50% of the ABC, and have the key personnel and equipment, (listed in the eligibility forms) available for the prosecution of the contract. The BAC will use non- discretionary pass and fail criteria in the eligibility Check/Screening as well as the examination of the bids. The BAC will conduct post qualification of the lowest calculated bid.
  3. The METALS INDUSTRY RESEARCH AND DEVELOPMENT CENTER (MIRDC) reserves the right to accept or reject any bid, to annul the bidding process, and to reject all bids at any time prior to contract award, without thereby incurring any liability to the affected bidder or bidders.

 

For further information, please refer to:

 

Signed
ATTY. TRIXIE HAZEL C. VELUZ
BAC Chairman
Metals Industry Research and Development Center
Tel. No. 837-0431 local 444 and 442
Fax No. 837-0430

 

Approved for Posting:

 

Signed
AGUSTIN M. FUDOLIG, Dr. Eng.
OIC - Office of the Executive Director

 

 

INVITATION TO APPLY FOR ELIGIBILITY AND TO BID

“PROCUREMENT OF HARDNESS TESTER”

 

General Specifications

Type of hardness test

Rockwell Table Top Hardness Tester

Screen Display:
Test Result, Test Status & Scale

Digital-LCD
Test Result, Test Status & Scale

Hardness scale / Display

A,B,C,D,E,F,G,
H,K,L,M,P,R,S,V

15N, 30N, 45N,
15T, 30T, 45T,
15W, 30W, 45W,
15X, 30X, 45X,
15Y, 30Y, 45Y

Regular Rockwell + Rockwell Superficial Hardness Tester

Minor Load/ Preliminary Load

N: 29.42 & 98.07
Kgf: 3 & 10

Test Load

N: 147.1 294.2 441.3
Kgf: 15 30 45
N: 588.4 980.7 1471
Kgf: 60 100 150

Minimum Reading / Resolution

HR

Operation During Testing: Test Force Setting, Application and Start-Up (for Minor and Test Load)

Automatically operated and can be manually operated

Dwell time

1-99 sec

Minimum Standard/ standard compliant\(Hardness Conversion)

ASTM E-18

Easy Load Selection

Provision for easy selection of test loads

Range of Specimen height
(Vertical testing capacity)

0.5-180mm
(Note: accessories may decrease available capacity)

Max. specimen depth

150mm

Power supply

Single Phase

 

AC 100 – 240V, 50/60HZ

Standard Accessories

Hardness Tester Blocks (min)
2 – HRC
1 – HRB
1 – H30N
1 – HR30T
Diamond indenter (for superficial & twin type) Steel ball indenter (Ø 1/16” / Ø 1.588mm) Spare steel ball (Ø 1/16” / Ø1.588mm)
Spare indenters used for HRB, HRF,HRG & HRxxT scales
Anvil-flat (Ø 60mm) & V-shape (large) Power cable (3p-2.5mm)
Level adjusting leg
Machine cover and accessory box or equivalent kit
Instruction and maintenance manual (English) Cost for commissioning of the machine and turnkey

Others

The digital hardness tester maybe equipped with data storage for evaluation or analysis and input/output port/s for PC connection or data transfer.

 

  1. The METALS INDUSTRY RESEARCH AND DEVELOPMENT CENTER through the project Development of Vacuum Oil Quench Heat Treatment Furnace, intends to apply the sum of Seven Hundred Thousand Pesos (Php 700,000.000) being the Approved Budget for the Contract (ABC) to payments under the contract for “Procurement of Hardness Tester”
  2. The METALS INDUSTRY RESEARCH AND DEVELOPMENT CENTER (MIRDC) now invites bids for “Procurement of Hardness Tester” located at Gen. Santos Ave., Bicutan, Taguig City. Delivery of Goods is Forty-five (45) calendar days.
  3. Bidders should have completed, within THREE (3) YEARS from the date of submission and receipt of bids, a contract similar to the Project. The description of an eligible bidder is contained in the Bidding Documents, particularly in Section II. Instruction to Bidders (ITB).
  4. Bidding will be conducted through open competitive bidding procedures using non- discretionary pass/fail criterion as specified in the Implementing Rules and Regulations (IRR) of Republic Act 9184 (RA 9184), otherwise known as the “Government Procurement Reform Act”
  5. Bidding is restricted to Filipino citizens/sole proprietorships, partnerships, or organizations with at least sixty percent (60%) interest or outstanding capital stock belonging to citizens of the Philippines.

  6. Interested bidders may obtain further information from Ms. Nimfa O. Usero, BAC Secretariat, MIRDC and inspect the Bidding Documents at the address given below during office hours, from 9:00 A.M. to 4:00 P.M.
  7. A complete set of Bidding Documents may be purchased by interested Bidders on January 31, 2013 until the deadline for the submission of bids, from the MIRDC BAC Secretariat, , Ground Flr., Laboratories Bldg., upon payment of a nonrefundable fee for the Bidding Documents in the amount of Seven Hundred Pesos (Php 700.00)
  8. The MIRDC-BAC will hold Pre-Bid Conference on February 7, 2012 at 9:00 A.M. at the MIRDC Conference Room, 2nd Floor, MIRDC Laboratories Building, MIRDC Compound, Gen. Santos Ave., Bicutan, Taguig City which shall be limited only to all interested parties who have purchased the Bidding Documents.
  9. Bids must be delivered not later than February 20, 2013 between 8:00 A. M. to 8:30 A.M. only at MIRDC Conference Room, 2nd Floor, MIRDC Laboratories Building, MIRDC Compound, Gen. Santos Ave., Bicutan, Taguig City. All bids must be accompanied by a bid security in any of the acceptable forms in the amount described in ITB Clause 18.


    Bid opening shall be on February 20, 2013, 9:00 A.M. at the MIRDC Conference Room, 2nd Floor, MIRDC Laboratories Building, MIRDC Compound, Gen. Santos Ave., Bicutan, Taguig City. Bids will be opened in the presence of the bidders’ representatives who choose to attend. Late bids shall not be accepted.


  10. The Complete Schedule of Bidding Activities is summarized as follows:

    Activities

    Schedule / Time

    Venue

    1. Posting of Invitation to Bid

    January 14, 2013

     

    2. Issuance of Bid Documents

    January 31, 2013
    9:00 am to 4:00 pm

    MIRDC-BAC Secretariat, Ground Floor, MIRDC Laboratories Bldg.

    3. Pre-bid Conference

    February 7, 2013
    9:00 A.M

    MIRDC, Conference Room, 2nd Floor, Laboratories Bldg.

    4. Submission of Envelopes

    February 20, 2013 between 8:00 A.M. to
    8:30 A.M.

    MIRDC, Conference Room, 2nd Floor, Laboratories Bldg.

    5. Opening of Envelopes

    February 20, 2013
    9:00 A.M.

    MIRDC, Conference Room, 2nd Floor, Laboratories Bldg.

  11. The Bidders shall submit three (3) copies of their duly accomplished eligibility requirements and Technical and Financial Proposal in two (2) separate sealed envelopes.
  12. The participating bidders/contractors should have completed a similar project of at least 50% of the ABC, and have the key personnel and equipment, (listed in the eligibility forms) available for the prosecution of the contract. The BAC will use non-discretionary pass and fail criteria in the eligibility Check/Screening as well as the examination of the bids. The BAC will conduct post qualification of the lowest calculated bid.
  13. The METALS INDUSTRY RESEARCH AND DEVELOPMENT CENTER (MIRDC) reserves the right to accept or reject any bid, to annul the bidding process, and to reject all bids at any time prior to contract award, without thereby incurring any liability to the affected bidder or bidders.

 

For further information, please refer to:

 

Signed
ATTY. TRIXIE HAZEL C. VELUZ
BAC Chairman
Metals Industry Research and Development Center
Tel. No. 837-0431 local 442 and 444
Fax No. 837-0430

 

Approved for Posting:

 

Signed
AGUSTIN M. FUDOLIG, Dr. Eng.
OIC - Office of the Executive Director

 

 

 

INVITATION TO APPLY FOR ELIGIBILITY AND TO BID

 

“PROCUREMENT OF CNC LATHE”

 

CNC Lathe: General Specifications:

Machining diameter :

min of 325 mm

Machining length :

min of 50 mm

Bar work capacity :

min of 50 mm

Spindle speed (rpm) :

min of 5000 rpm

Rapid Traverse X- axis:

min of 30m/min

Rapid Traverse Z- axis:

min of 30m/min

Spindle Motor :

Min of 15kW

Spindle bore:

min of 60mm

No of tools:

min of 8 tools

Chuck size (thru hole):

min of 8"

Capable of running 5000 rpm for 24 hours non-stop ( must have written guarantee from the manufacturer)

Electricals of
220V/3Ph/60Hz

 

Guides used in XZ
axes :

Roller guides

 

Accessories included:

 

8"3 jaw thru hole hydraulic chuck

Coolant system

Full coverage chip and coolant guard

Tailstock stock Automatic

Tailstock live center: MT5

Control type: Fanuc

Integrated Spindle Motor

Set of adjusting tools

Tooling holders consisting of:

- Turning holder, 4 pcs.

- Boring bar holder, 4 pcs.

- Boring bar socket 8 mm, 2 pcs.

- Boring bar socket 10 mm, 2 pcs.

- Boring bar socket 12 mm, 2 pcs.

- Boring bar socket 16 mm, 2 pcs.

- Boring bar socket 20 mm, 2 pcs.

- Boring bar socket 25 mm, 2 pcs.

- Boring bar socket 32 mm, 2 pcs.

- Turning block, 4 pcs

Automatic tool eye

Work light (LED)

Operator door interlock

Tool cabinet

Accessories included:

Startup tooling package

Startup Measuring Tool Package

Chip conveyor

Collet chuck (42mm capacity) with set of collets from 6 to 42 mm in 1 mm increments

 

Other requirements:

Warranty of 1 year after installation (manufacturer should provide warranty
certificate)

Commissioning of the machine in MIRDC

1 week training for the following:

- Programming

- Machine operation

- Preventive maintenance

Laser calibration upon installation

Laser calibration 1 year after installation

Wiring and other items needed to connect the machine to power source

Delivery to MIRDC including material handling to move the machine in
place

The bidder must have extensive local service support. The following should be provided:

- Certificate from the manufacturer that the bidder's staff have trained
in manufacturer's factory and are qualified to service and conduct training on the machine.

- Organizational chart detailing number of service staff including years of tenure

Nationality of Maker: Japan, Germany, or USA

Delivery to MIRDC, Bicutan

    1. The METALS INDUSTRY RESEARCH AND DEVELOPMENT CENTER through the project Development and implementation of Appropriate Training Curriculum Design for CNC Machine Tool Programming and Operations as Human Resource Intervention for the Sustainable Growth, Productivity and Competitiveness of the M &E Sector intends to apply the sum of Thirteen Million Four Hundred Thousand Pesos Only (Php 13,400,000.00) being the Approved Budget for the Contract (ABC) to payments under the contract for “Procurement of CNC Lathe”.
    2. The METALS INDUSTRY RESEARCH AND DEVELOPMENT CENTER (MIRDC) now invites bids for “Procurement of CNC Lathe” located at Gen. Santos Ave., Bicutan, Taguig City. Delivery of Goods and Installation is Sixty (60) calendar days.
    3. Bidders should have completed, within three (3) years from the date of submission and receipt of bids, a contract similar to the Project. The description of an eligible bidder is contained in the Bidding Documents, particularly in Section II. Instruction to Bidders (ITB).
    4. Bidding will be conducted through open competitive bidding procedures using non- discretionary pass/fail criterion as specified in the Implementing Rules and Regulations (IRR) of Republic Act 9184 (RA 9184), otherwise known as the “Government Procurement Reform Act”.
    5. Bidding is restricted to Filipino citizens/sole proprietorships, partnerships, or organizations with at least sixty percent (60%) interest or outstanding capital stock belonging to citizens of the Philippines.
    6. Interested bidders may obtain further information and inspect the Bidding Documents at the MIRDC BAC Secretariat, Ground Flr., Laboratories Bldg., on February 4, 2013 from 9:00 A.M. to 4:00 P.M.
    7. A complete set of Bidding Documents may be purchased by interested Bidders from the MIRDC BAC Secretariat, Ground Flr., Laboratories Bldg., upon payment of a nonrefundable fee for the Bidding Documents in the amount of Eleven Thousand Five Hundred Pesos (Php 11,500.00)
    8. The MIRDC-BAC will hold Pre-Bid Conference on February 18, 2013 at 9:00 A.M. at the MIRDC Conference Room, 2nd Floor, MIRDC Laboratories Building, MIRDC Compound, Gen. Santos Ave., Bicutan, Taguig City which shall be limited only to all interested parties who have purchased the Bidding Documents.
    9. Bids must be delivered not later than March 4, 2013 between 8:00 to 8:30 A.M. at MIRDC Conference Room, 2nd Floor, MIRDC Laboratories Building, MIRDC Compound, Gen. Santos Ave., Bicutan, Taguig City. All bids must be accompanied by a bid security in any of the acceptable forms in the amount described in ITB.

      Bid opening shall be on March 4, 2013, 9:00 A.M. at the MIRDC Conference Room,
      2nd Floor, MIRDC Laboratories Building, MIRDC Compound, Gen. Santos Ave., Bicutan, Taguig City.
      Bids will be opened in the presence of the bidders’
      representatives who choose to attend.
    10. The Complete Schedule of Bidding Activities is summarized as follows:

Activities

Schedule / Time

Venue

1. Posting of Invitation to Bid

January 15, 2013

 

2. Issuance of Bid Documents

February 4, 2013
9:00 am to 4:00 pm

MIRDC-BAC Secretariat, Ground Floor, MIRDC Laboratories Bldg.

3. Pre-bid Conference

February 18, 2013
9:00 A.M

MIRDC, Conference Room, 2nd Floor, Laboratories Bldg.

4. Submission of Envelopes

March 4, 2013 between
8:00 A.M. to 8:30 A.M.

MIRDC, Conference Room, 2nd Floor, Laboratories Bldg.

5. Opening of Envelopes

March 4, 2013
9:00 A.M.

MIRDC, Conference Room, 2nd Floor, Laboratories Bldg.

 

  1. The Bidders shall submit three (3) copies of their duly accomplished eligibility requirements and Technical and Financial Proposal in two (2) separate sealed envelopes.
  2. The participating bidders/contractors should have completed a similar project of at least 50% of the ABC, and have the key personnel and equipment, (listed in the eligibility forms) available for the prosecution of the contract. The BAC will use non- discretionary pass and fail criteria in the eligibility Check/Screening as well as the examination of the bids. The BAC will conduct post qualification of the lowest calculated bid.
  3. The METALS INDUSTRY RESEARCH AND DEVELOPMENT CENTER (MIRDC) reserves the right to accept or reject any bid, to annul the bidding process, and to reject all bids at any time prior to contract award, without thereby incurring any liability to the affected bidder or bidders.

 

For further information, please refer to:

Signed
ATTY. TRIXIE HAZEL C. VELUZ
BAC Chairman
Metals Industry Research and Development Center
Tel. No. 837-0431 local 442 and 444
Fax No. 837-0430

 

Approved for Posting:

 

Signed
AGUSTIN M. FUDOLIG, Dr. Eng.